Shadegan steel Making project
The purpose of the project implementation: To create an annual production capacity of 800,000 tons of steel ingots (Billets) in the Shadgan steel factory in the form of low carbon steel and medium carbon steel with high resistance in the dimensions of 130×130, 150×150, 180×180 and 200 * 200 mm and 6 to 12 meters Length.
Client: Iran National Steel Group
Consultant: Taraseth Engineering Company
Site Address: Khuzestan province, Shadgan city, Imam Khomeini port, Sarbandar, km 12 of Abadan road.
Project Schedule: 30 months
Type of contract: EPC / Turn Key (engineering – supply – construction and installation and commissioning).
Project status:In progress / First Arc & First Melt Passed
Consortium:
Sanaa Steel Industries Company (participation leader) – Sadid Industrial Group – Karun Dezdasht – MCC Italian TENOVA company (supplier of melting technology) / Italian Danieli company (automatic casting technology supplier) / Italian Tecoaer company (dust collector technology supplier) / Italy Siad company (industrial gas production technology supply) / Siemens company (automation technology supply) precision instruments) – TAMINI (providing furnace transformers).
Summary of project operations:
- Implementation of melting unit, Continuous Casting Machine( CCM)
- Implementation of ground surveys and pile-driving optimization calculations
- Industrial and public facilities system
- Secondary production units, repair workshops, and office buildings
- Power supply, substation, power transmission and distribution system
- Water and sewage treatment and transmission system
- Natural gas unit and production of industrial gases, tanks and gas transmission
- Infrastructure and construction of access roads